EV Charging Time and Cost

Estimate constant-rate EV charging time and cost from usable capacity, charge targets and losses.

On-device No sign-up Free to use

Estimate EV charging controls

Showing an example. Edit to see your own.

?

?

?

?

?

?

?

?

Processed in your browser. Your inputs stay on this device.

Result

Showing an example.

Charging a 60 kWh usable battery from 20% to 80%, at 7.2 kW input and 90% efficiency.

5.556 hours; estimated cost 8.00

https://usefreetools.net/ev-charging-time-cost · 20 November 2026

Was this helpful?

How to use EV Charging Time and Cost

  1. Enter usable battery capacity in kWh and starting and target charge percentages. Target must be at least the starting charge.
  2. Enter charger and vehicle input-power limits in kW. The lower limit is used, before applying the entered grid-to-battery efficiency.
  3. Set the price per grid kWh and any fixed session fee in one currency. This is a flat-rate scenario, without time-based or tiered charges.
  4. Calculate and compare stored battery energy, grid energy, duration and cost. Download calculation.csv to retain the entered scenario.

Example: EV Charging Time and Cost

Charging a 60 kWh usable battery from 20% to 80%, at 7.2 kW input and 90% efficiency.

You add
capacity: 60; initial: 20; target: 80; charger: 7.2; vehicle: 11; efficiency: 90; tariff: 0.2; fee: 0
You get
5.556 hours; estimated cost 8.00

Supported inputs and limits

  • Use plain decimal numbers without thousands separators.
  • Charge percentages are 0 to 100%; capacity and both power limits must be positive.
  • Efficiency must be greater than zero and no more than 100%.
  • The estimate holds power and efficiency constant.
  • Charging taper, temperature, vehicle state and shared-charger limits can change actual duration.
More details

No charge curve, station availability, live tariff or battery-health prediction is included.

The entered fee is added even if starting and target charge match, when calculated energy and duration are zero.

Where your input is processed

This tool does not upload your inputs. See the limits for anything saved on your device.

Questions about EV Charging Time and Cost

Which power limit controls the time estimate?

The lower of the charger and vehicle input limits. Battery energy is adjusted for efficiency to estimate grid energy, then divided by that input power.

Does the calculation include taper near a full battery?

No. It assumes constant input power. Real charging slows and can change with temperature, charge level and charger sharing.

What if the starting and target charge match?

Battery and grid energy are zero. The entered session fee still appears, because that fixed charge is an explicit assumption.

Page updated · Project managed by Tony Hines · Report a problem with EV Charging Time and Cost